Technical Session - I Optimizing and improving output of track machines during traffic blocks
1 A precious Commodity Deserves High Level Technical and Managerial input J.S. Mundrey (President- Rail Consult India)  
2 Optimization of NTC and associated track machines in mechanized track laying in DFCC Project Veer Narayan VP/ PMC,Rlys and Metro, Systra India, D. K. Singh GGM/DFCCIL  
3 Increasing the Productivity of Track Machines: An Invention or Discovery? Vijay Pandey Dy. CE /Track II /WCR, Rahul Jaipuriyar Ex. DGM /WCR  
4 Design mode tamping of track using trimble gedo vorsys measuring trolley- A case study in BPQ-KZJ Section of South Central Railways Akshay Kumar Jha chief track engineer, D.S.Rama Rao Sr. Divisional Engineer/North/SC Division, P.Devender SSE/PWay/SW/SC  
5 Effect of using Longer Measuring Chord in Tamping Machine Praveen Yadav, XEN/C/JU/NWR  
6 Innovation in BCM Machine to Optimise and Improving output during traffic Blocks M.K.Gupta Chief Engineer/Track machines, Pankaj Soin DyCE. TMC.II  
7 Proper method of correcting large alignment defect in Tangent Track Requiring multiple round of tamping Anil Choudhary Sr. Professor/IRICEN  
Technical Session - II Accelerated construction of Doubling Projects
1 Faster Execution of Doubling Works- Station Yards the Bottlenecks Vikram Gupta Chief Engineer/Track Procurement/SCR, Rajiv Tanwar Director/ Track Modernisation/ Railway Board  
2 Acceleration Using Modern Technologies: Light Detection and Ranging (LiDAR) & Seismic Refraction Survey Rajneesh Saroj Dy. Chief Project Manager/NHSRCL,Mumbai/CR  
3 Role of detailed Plan-Profile sheets in safe and Time bound Construction of Dedicated Freight Track Corridors in Mumbai Suburban Area Rajeev Tyagi, Anurag Rastogi Mumbai(South)DFCCIL  
4 Case study on Accelerated Construction of Danea –Ranchi Road doubling project of Dhanbad Division Sitesh Kumar Singh Chief Engineer/Construction\South East,Ashutosh Chourasia Dy. Chief Engineer/ Construction/ECR  
5 Accelerated construction by avoiding delays in doubling projects S.K.Sinha (Ex-IRSE) Project Director/IRCON  
6 Making Doubling Projects “Gatimaan” Arvind Jain CRS/Central Circle/Mumbai, Naresh Lalwani, Principal Chief Safety Officer/WR/Mumbai  
Technical Session - III Accelerated construction of Doubling Projects
1 Importance of Bridge Drawings in Speedy Execution of Doubling Projects and their Fast Track Approvals Shrirang Kamble Dy. CE(C)/Design/CR, Pradeep Bansode XEN(C)/Design/CR  
2 Pre-Engineered or Pre-Fabricated Building, the time saving nouveau solution to speedy building construction over Railway Projects Mona Srivastav, Chief Engineer/NR, Kaushal Sharma XEN/C/TKJ/NR  
3 Innovative ways for Track Works in Yards for Faster Commissioning of Doubling/Tripling on SC Railway Hemant Kumar Bhagoria Chief Engineer/Br.Rehab./SCR, Ch. Srinivasulu Rtd SSE/C/PW/SCR,J. Rajkumar, SSE/C/Works/Akola/SCR  
4 Faster Construction Methods in Launching of Open Web Girders on EDFC Atul B Khare Chief General Manager/DFCCIL, Sanjay Singh Chief Bridge Engineer Systra  
5 Suggested measures for Accelerated Construction of Doubling Projects in Indian Railway R. Shekhawat Senior Professor(Projects)/IRICEN/Pune, B. N. Bhaskar Chief Engineer/Con.- 1/NFR/Maligaon  
6 New Mechanized construction techniques for fast paced Construction of Railway Projects Ashutosh Rankawat Executive Directo/DFCCIL, Sanjay Gupta Chief General Manager/Ahmedabad/DFCCIL  
7 Accelerated construction of Doubling Projects A Template For Survey & Planning Anang Pal Malik  
Technical Session - IV Miscellaneous
1 Why IR need high strength rails Vipul Kumar, Chief Project Director,NR  
2 Independent Project Management Audit Sudhir Kumar Chief Commissioner of Railway safety (Retd.), Shashank Vaidya Director/Gem Engineering/Mumbai  
3 Analysis of performance of improved SEJ (T6902) in the field - Manoj Arora CTE/WR, Vaibhav Saklecha Divisional Engineer (South)/Ratlam/WR, Kamlesh More sse(Metallurgy)/CCG/WR  
4 Construction of hybrid pile foundations: a case study of hybrid pile foundation p3 of bridge no. 43 at Bakkal of USBRL project Praveen Kumar IRSE 2009 Senior Safety Officer/Engg./Safety Organisation/NR  
5 Deterministic Approach to Assess the Track Modulus in Shake Down State of Track Ballast S.K. Agarwal, Prof. Birdge, IRICEN, Md. Ubaid ADEN/BDC/ERly  
6 Improving quality of AT Welding on S.C. Rly- A case study Akshay Jha chief track engineer, P.V.N. Naidu ADEN/LINES/Vijaywada, G. Kiran Babu Sr.Instructor/TWTC/Vijaywada, A Karthik Roy JE/PWay/HQ/SCR  
7 International Practices in Sustainable Transport Infrastructure Development Saibaba Ankala Chief Engineer/IR  
8 Various methods of Rail Flash Butt Welding on IR and their merits & demerits for capacity enhancement works including doubling projects Saibaba Ankala Chief Engineer/IR  
Technical Session V: Presentations by Trade &Industry
1 Advantages of tensile fabric structures in accelerating the doubling projects (Tensile Roofing Structures) Priyanka Latwal, Raja Kishore Dash Low and Bonar  
2 Stabilization of railway track using of geogrid and geotextile Sonal Kulkarni manager/Maccaferri Env Sol Pvt Ltd., P.V. Rao Sr. Vice President Rail Infra, Taha Masvi Dy. Manager/Estimation/Howe Engineering Projects(India) Pvt. Ltd,Ratnakar R. Mahajan Regional Technical Manager/ISEAP/Maccaferri Env Sol Pvt Ltd.  
3 Environment friendly construction and Waste management in Khurja – Dadri section of Dedicated Freight Corridor: A Sustainable Approach Md. Tanveer Khan Project Manager (Engineering)/DFCCIL/Eastern Corridor/Noida, Ashish Kumar Environment Manager/Tata Projects Limited (JV)  
4 Hexagon Railway Solutions Ashok Sharma Vice President/Hexagon  
5 Accelerate the construction of track V. N. Singh Director/Operation Phooltas Transrail Limited  
6 FEM Analysis of Railway Embankment with Enhanced Load Capacity on Poor Subgrades Arghadeep Das Gupta, Abhineet Godayal, Surada yadava Rao Spar Geo InfraPvt. Ltd. India  
Papers to be published without Presentation
1 Optimizing and Improving Output of Ballast Cleaning Machine (BCM) S. K Srivastava DRM/BKN, M. M. Upadhyaya Sr DEN/C/BKN  
2 Fast pace deep screening of turnouts by BCM after slewing the adjacent main line and extensive use of JCB for removing obstruction Anant Kumar Sr.DEN/South/BRC  
3 A step towards improving BCM operation efficiency and the track maintenance system Raghavendra Pratap Singh Project Manager/National High Speed Rail Corporation, Deepankar Choudhry Institute Chair Professor/Department of Civil Engineering/IIT Bombay  
4 Geocell: An Emerging Technique of Soil Reinforcement in Civil Engineering Field & Faster way of soil Stabilization Akhil Kumar Agarwal & Rajesh Kumar Garg (Chief Engineers/NR)  
5 A Case Study: “Balance Doubling Between Lucknow- Sultanpur-Varanasi (148Km doubling Work)” and Critical Issues Observed Sunil Kumar (IRSE-99 Batch, Dy. Chief Engineer TP/NR)  
6 New railway line and doubling projects - Giving New Direction N. R. Bhairava AEN/JND/WR  
7 Accelerated construction of doubling project H.S.Yadav CAO/C-2/NFR Guwahati, B.N. Bhaskar CE/C-1/NFR Guwahati  
8 Proposal for Standardization of Tunnel Cross Section, design and Drawings in Indian Railways Mr. Avijit Majumder Dy CE/CON/Design-2/Maligaon, Mr. Koteshwar Ponnala Dy CE/CON/Design-1/Maligaon, Mr. Manas Ranjan Mohapatro, JE/CON/Design-1/Maligaon  
9 Accelerated construction of Doubling/Multiple Line Projects Sri J.N.Lal Das, Retd. PCE/S.E.Rly, Ex- CAO/Con./E.C. Rly  
10 Influence of Non-Linear Behavior of Track Fastening System on Track Modulus Valji Shinde Pursuing Ph.D. Sinhgad College of Engineering/Vadgaon (Bk) Pune, Dr. S. S. Sarawade Professor/Mechanical Engineering Department/M.E.S. College of Engineering/Pune, Prof. S. K. Agarwal Bridge Engineering Department IRICEN/Pune  
11 Convergence of MGNREGS with Railways and thereby Utilizing for Permanent way Activities Pratham Agarwal (Assistant Executive Engineer, Construction, CR)  
12 Slope Erosion Control and Protection System adopted in Eastern DFCCIL Project for Railway Formation for speedy Construction Atul B Khare, Chief General Manager/ DFCCIL  
13 Optimising use of traffic blocks with integrated approach and block management system P Srinivas, DRM/Vijayawada  
14 Planning of Doubling Project for Accelerated Construction C.M. Gupta Sr. Professor/Br.2. IRICEN/Pune