Session -1. Facing challenges under Mixed Traffic Regime of Semi High Speed and heavy Axle

Load – Design Aspects

Sr. No.

Name of Speaker & Designation

Paper Title

1.1

Hitesh Khanna, Director (Works)

Ircon International Ltd.,

Anish Kumar, CPM, IRICON

Semi High-speed Trains on Indian Railways network:Track and Vehicle side demand

1.2

Ramesh Pinjani, Sr. Prof/Bridge-2/ IRICEN, Pune

Important track design parameters to cater semi high speed & heavier axle loads trains

1.3

Sandip Kumar Saha, DEN/East/Ranchi/SER

Effect of Temperature gradient on High speed track with Track-Bridge interaction

1.4

Yerramshetty Srinivas, ADEN/ARK,

ECoR, R. P. Singh, Asst. Professor/ Track- III, IRICEN, Pune

Stress Assessment in Railway Foundation System for semi High Speed & High Axle Loads TrainsSpeed & High Axle Loads Trains

1.5

M. Suyambullingam,

Chief Engineer / S. Railway.

Retrofitting of Well Foundation- Design to carry Heavy Axle Load Trains & PSC beamsTrains & PSC beams

1.6

Shri Amit Kumar Roy

Chief Project Manager/RVNL

Sub grade improvement using stone column for semi high speed and heavy axle load – A case study on actual implementation on doubling work of Kharagpur Division

1.7

Akshay Singh Rathore, IRSE(P) 2015,

Shashank Kulshreshtha, IRSE(P)2015, Vikas Yadav, IRSE(P) 2015,

R.P. Singh, Asst. Professor Track,

IRICEN, Pune

Issues related with compaction during construction of New Railway Embankment For Heavy Axle Loads

1.8

Mohammad Islam, ADEN/JTJ/MAS/ Southern Railway, Chennai-003

Dynamic Analysis of Vehicle- Structure interaction in Indian Railways BOXN25 Wagon – Steel Plate Girder  Bridge under Semi High Speed and Heavy Axle Load

1.9

Nitin Garg, XEN/TP/NCR

Facing challenges under Mixed Traffic Regime of Semi High Speed and heavy Axle Load – Design Aspects

1.10

Sandeep Sharma, ED/Tract-II/RDSO Pranav Kumar, Director/Trach-IV/RDSO Ritu Raj, Dy. Director/EF/RDSO

S. K. Avasthi, RDSO Dy. Dir./CS/RDSO

Design and Development of Wider & Heavier PSC Sleeper and Fastening System for suitable for Semi-high speed and heavy Axle Load

1.11

Vipul Kumar, ED/Track-I/RDSO

Ajay Kumar, Director/Track -II/RDSO

Challenges in Design & Maintenance of Track Structure for Mixed Traffic Regime on IR


 

Session -2. Facing challenges under Mixed Traffic Regime of Semi High Speed and Heavy Axle

Load –  Maintenance Aspects

Sr. No.

Name of  Author & Designation

Topic of Paper

2.1

J. S. MUNDREY, Consultant in Track Technology, Formerly Advisor Civil Engineering, Railway Board

REACTIVE TO PROACTIVE APPROACH TO TRACK MAINTENANCE ON INDIAN RAILWAYS

2.2

M. M. Agarwal, Former Chief Engineer/ NR & Former Executive Director/IPWE K. K. Miglani, Former Dy. Chief Engineer(Track), NR

Challenges & possible solutions for appropriate Track technology for mixed traffic regime of Semi High Speed and Heavy Axle Loads based on global experience.

2.3

Dr. Florian Auer

Senior Expert Track Technology

Sustainable maintenance of  High- speed lines with mixed traffic

2.4

Narayan Rangaraj, Professor, Industrial

Engineering & Operations Research, IIT Bombay

R. Vidyadhar, MTech Student, Industrial

Engineering & Operations Research, IIT Bombay

Ayush Agrawal, Associate ITS Engineer,

ITS Planner and Engineers, Hyderabad

Simulation of Mix-traffic Railway Networks carrying Semi High Speed passenger trains and High Axle Load freight trains.

2.5

Pradeep Kumar Garg, CE/TMC/C..Rly.

Issues involved in the maintenance of track carrying heavy axle loads in reference to Deep Screening

2.6

Md Tanveer Khan, ADEN/BWN, HWH

Diuv., ER Sushil Kumar, SSE(P.Way)/BWN, HWH Div., ER Rajesh

Kumar, SSE(P.Way)/BWN, HWH

Division, ER and Avinash Jain, Sr. DEN/2/HWH, ER

Maintenance of Points and Crossings under Mixed Traffic Scenario of Semi High Speed and Heavy Axle Loads challenges, problems and their innovative solutions

2.7

N. R.   Bairawa, SSE(TR) ADI, W.Rly.

Semi High Speed and Heavy Axle Loads and Maintenance Challenges

2.8

Saurabh Singh, AXEN/TMS, NCR, Allahabad, R.P. Singh Asstt. Prof.-III/ Track, IRICEN, Pune

Assessment of Indian Railways Track Ballast in the Regime of Semi High Speed and Heavy Axle Load Requirement

2.9

AKHIL AGARWAL, Dy./CE/LAND/NR

Facing challenges under Mixed Traffic Regime of Semi High Speed and Heavy Axle Load & their impart on Track

2.10

A. V. Mittal, Dy.CE/P&D/NR

Engineering Applications of a Drone in Railway Organization

2.11

Vipul Kumar Ed/Track/RDSO

CHALLENGES IN DESIGN & MAINTENANCE OF TRACK STRUCTURE FOR MIXED TRAFFIC REGIME ON IR

3.  Miscellaneous (Bridges)

Sr. No.

Name of Author & Designation

Topic of Paper

3.1

S.N Agarwal, GM/SER K. C Swami, CBE/WR

Avinash Kumar, Dy. CE/D/WR

Strengthening of damaged PSC bridge girders with Carbon Fibre Reinforced Polymer “CFRP” System

3.2

Ajit Pandit, CAO/Con-3/NFR(Con.)

R P Jingar CE/Con-1/NFR(Con.)

S Kamei Dy. CE/Con-2/DBRT, NFR (Construction)

Use of Spherical Bearings in Railway Bridges- Bogibeel Bridge Project

3.3

A. K. Yadav, CAO/C/NFR

S. P. Deshmukh, Dy. CE/C/Bairabi, NFR

Instrumentation and Monitoring During Construction of Tunnels in Bairabi-Sairang NL Project

3.4

Satish Kumar

AGM/ER & MD/KMRCL

Challenges of Tunnelling in East - West Metro Kolkata Tunnelling Below Colvin Court

Building

3.5

A.   Saibab, CE/E/NFR

M.  Subash, Dy. CE/C/NFR

Challenges in Design and construction of the World’s Tallest Railway Bridge in Jiribam-Imphal New Railway Line (North-East Frontier Railway)

3.6

M. Suyambulingam, CBE/SR Ram Kishore, Dy. CE/ROB/MAS

G. Radhakrishnan, SSE/Bridge/MDU

“Elevated Road-cum-Rail Crossings” (Precast Tunnel type RC box) An article by

3.7

Rajesh Prasad,

CPM (M) & GGM/RVNL/Kolkata PIU

Implementation of Structural Health Monitoring System for live monitoring of the cable forces at Barddhaman ROB

3.8

Pradeep Ahirkar , Sr DEN/Co/BRC

Box pushing work under Relieving Girder at higher speed

3.  Miscellaneous (Other than Bridges)

Sr. No.

Name of Author & Designation

Topic of Paper

4.1

Harpal Singh, CE/Con-8/Maligaon,

B.N.Bhaskar, Dy CE/Con/Agartala, Koteshwar Ponnala,  AEE/Udaipur

Use of Modern Retrofitting Techniques in Udaipur Staion Building of  Agartala-Sabroom New Line Project of  NFR.

4.2

Subodh Jain, ME (Retd.) Rly. Board

Vipul Kumar, ED/Track/RDSO

Design and Development of Ballastless Track with Indigenous Fastening System

4.3

Anupam Avasthi, Sr. DEN

Kohei Nagai, Associate Professor

Shingo Asamoto, Associate Professor

Seishi Goto, Professor Emeritus

Study of Possible causes of Premature Cracking of Sleepers in Indian Railways

4.4

Sai Singh Khongrymmai, Dy. CE/NFR/ AGTL, Harpal Singh, CE/NFR? Maligaon, Supriya Dutta, JE/Works/NFR/ Agartala

Mechanised Blending and Laying of Blanketing Material along with application of Geo-textile and Geo- grids in formation of Agartala- Sabroom of NF Railway Project

4.5

A. K. Yadav, CAO/C/NFR

P. Deshmukh, Dy. CE/C/Bhairabi/NFR

HIGH EMBANKMNT V/S VIADUCT- A CASE STUDY

4.6

LUV SEHGAL

Graduate Research Assistant, RailTEC, UIUC AMIT GARG,

Graduate Research Assistant, RailTEC, UIUC

and Chief Engineer, Indian Railways

VIJAY SEHGAL

CAO (Construction), WCR Dr WILLIAM BUTTLAR

Prof., Department of Civil and Environmental

Engg, UIUC

HOT MIX ASPHALT IN BALLASTED RAILWAY TRACK: INTERNATIONAL EXPERIENCE AND INFERENCES

4.7

Surendra Bansal, DEAN, IRICEN

PavanTotla, Anuj Sharma, Aindrila Roy, Bishawajeet Das, Shoyeb Ahmad

Strategy and It’s Implementation For Growth and Sustainability of Infrastructure and Operation: A Case Review of Indian Railways

4.8

Sharad Kumar Agarwal, Prof. Br. IRICEN, PA

Vikramjeet Singh, SohanlalKag, Alok Kumar, Sanjeev Dangi,

B.E. Final Year, E&TC, Symbiosis Institute of

Technology, Pune

Isha Agarwal, B.Des, IIT Guwahati

Development of Noncontact Displacement Sensor at IRICEN

4.9

Anil Choudhary, Director/Track Machine-

III,RDSO Aqil Mohsin, SSE/Mechanical/TMM, RDSO Kavindra Nath Rai,

SSE/Engg/TMM,RDSO

AUTO RAIL PANEL LINKER (For Automatic Linking of 20 Rail Panel During Unloading)

4.10

Niranjan Kumar, SSE(Mobility), Rly. Board

S K Srivastava, ED(Mobility)CE, Rly. Board

Economics of TRR/TBR/TSR vis- à-vis CTR in Mixed Traffic Regime

4.11

N. Kaushal Kishore, CE/TP/WCR/Jabalpur

Handling Alignmernt Adversity