Session-1

OPTIMIZING AND IMPROVING OUTPUT OF TRACK MACHINES DURING TRAFFIC BLOCKS

 

1.1

A PRECIOUS COMMODITY DESERVES HIGH-LEVEL TEC

 

1.2

OPTIMIZATION OF NTC AND ASSOCIATED TRACK MAC

 

1.3

INCREASING THE PRODUCTIVITY OF TRACK MACHINE

 

1.4

DESIGN MODE TAMPING OF TRACK USING TRIMBLE

 

1.5

EFFECT OF USING LONGER MEASURING CHORD IN

 

1.6

INNOVATION IN BCM MACHINE TO OPTIMISE AND

 

1.7

PROPER METHOD OF CORRECTING LARGE ALIGNMENT

   

Session-2

ACCELERATED CONSTRUCTION OF DOUBLING PROJECTS

 

2.1

A PRECIOUS COMMODITY DESERVES HIGH-LEVEL TEC

 

2.2

OPTIMIZATION OF NTC AND ASSOCIATED TRACK MAC

 

2.3

INCREASING THE PRODUCTIVITY OF TRACK MACHINE

 

2.4

DESIGN MODE TAMPING OF TRACK USING TRIMBL

 

2.5

EFFECT OF USING LONGER MEASURING CHORD IN

 

2.6

INNOVATION IN BCM MACHINE TO OPTIMISE AND

 

2.7

PROPER METHOD OF CORRECTING LARGE ALIGNMENT

   

Session-3

ACCELERATED CONSTRUCTION OF DOUBLING PROJECTS

 

3.1

IMPORTANCE OF BRIDGE DRAWINGS IN SPEEDY EXECUTION OF DOUBLING PROJE

 

3.2

PRE-ENGINEERED OR PRE-FABRICATED BUILDING, THE TIME-SAVING NOUVEAU

 

3.3

INNOVATIVE WAYS FOR TRACK WORKS IN YARDS

 

3.4

FASTER CONSTRUCTION METHODS IN LAUNCHING OF OPEN WEB GIRDERS O

 

3.5

SUGGESTED MEASURES FOR ACCELERATED CONSTRUCTION OF DOUBLING PR

 

3.6

NEW MECHANIZED CONSTRUCTION TECHNIQUES FOR FAST PACED CONSTRUCTION

 

3.7

ACCELERATED CONSTRUCTION OF DOUBLING PROJECTS

   

Session-4

MISCELLANEOUS

 

4.1

WHY IR NEED HIGH STRENGTH RAILS

 

4.2

INDEPENDENT PROJECT MANAGEMENT AUDIT

 

4.3

ANALYSIS OF PERFORMANCE OF IMPROVED SEJ (T-6902) IN THE FIELD

 

4.4

CONSTRUCTION OF HYBRID PILE FOUNDATIONS A CASE STUDY OF HYBRID PILE FOUNDATION P3 OF BRIDGE NO

 

4.5

DETERMINISTIC APPROACH TO ASSESS THE TRACK MODULUS IN SHAKE DOWNSTATE OF TRACK BALLAST

 

4.6

IMPROVING QUALITY OF AT WELDING

 

4.7

INTERNATIONAL PRACTICES IN SUSTAINABLE TRANSPORT INFRASTRUCTURE DEVELOPMENT

 

4.8

VARIOUS METHODS OF RAIL FLASH BUTT WELDING ON IR AND THEIR MERITS & DEMERITS FOR CAPACITY ENHAN

 

4.9

RAILWAY INFRASTRUCTURE INVESTMENT PLAN

   

Session-5

PRESENTATIONS BY TRADE &INDUSTRY

 

5.1

ADVANTAGES OF TENSILE FABRIC STRUCTURES IN ACCELERATING THE DOUBLING PROJECTS

 

5.2

STABILIZATION OF RAILWAY TRACK USING OF GEOGRID AND GEOTEXTILE

 

5.3

ENVIRONMENT-FRIENDLY CONSTRUCTION AND WASTE MANAGEMENT IN KHURJA – DADRI SECTION

 

5.4

HEXAGON RAILWAY SOLUTIONS

 

5.5

FEM ANALYSIS OF RAILWAY EMBANKMENT WITH ENHANCED LOAD CAPACITY ON POOR SUBGRADES

 

5.6

INTERNET OF THINGS

 

5.7

ONLINE MONITORING OF RAILWAY TRACK HEALTH

   

--

ONLY PAPERS PUBLISHED

     
 

1.

OPTIMIZING AND IMPROVING OUTPUT OF BCM

 

2.

FAST PACE DEEP SCREENING OF TURNOUTS BY BCM AFTER SLEWING THE ADJACENT MAINLINE AND EXTENSIVE USE OF JCB FOR REMOVING OBSTR

 

3.

A STEP TOWARDS IMPROVING BCM OPERATION EFFICIENCY AND THE TRACK MAINTENANCE SYSTEM

 

4.

GEOCELL AN EMERGING TECHNIQUE OF SOIL REINFORCEMENT IN CIVIL ENGINEERING FIELD

 

5.

A CASE STUDY “BALANCE DOUBLING BETWEEN LUCKNOW- SULTANPUR-VARANASI (148KM DOUBLING WORK)” AND CRITICAL ISSUES OBSERVED

 

6.

नई रेलवे लाइन एवं दोहरीकरण निर्माण परियोजनाओ को गति प्रदान करना

 

7.

ACCELERATED CONSTRUCTION OF DOUBLING PROJECT

 

8.

PROPOSAL FOR STANDARDIZATION OF TUNNEL CROSS-SECTION, DESIGN AND DRAWINGS IN IR

 

9.

ACCELERATED CONSTRUCTION OF DOUBLINGMULTIPLE LINE PROJECTS

 

10.

INFLUENCE OF NON-LINEAR BEHAVIOR OF TRACK FASTENING SYSTEM ON TRACK MODULUS

 

11.

CONVERGENCE OF MGNREGS WITH RAILWAYS AND THEREBY UTILIZING FOR PERMANENT WAY ACTIVITIES

 

12.

SLOPE EROSION CONTROL AND PROTECTION SYSTEM ADOPTED IN EASTERN DFCCIL PROJECT FOR RAILWAY FORMATION FOR SPEEDY CONSTRUCTION

 

13.

OPTIMISING USE OF TRAFFIC BLOCKS WITH INTEGRATED APPROACH AND BLOCK MANAGEMENT SYSTEM

 

14.

PLANNING OF DOUBLING PROJECT FOR ACCELERATED CONS

 

15.

USE OF TAMPING SIMULATOR FOR OPTIMIZING TRACK

 

16.

CORRELATION BETW TRC RECORDING & FIELD MEASUREMENTS

 

17.

EXCEL PROGRAM FOR ANALYSIS OF FIXED ARCHES

 

18.

OPTIMIZING & IMPROVING OUTPUT OF TRACK MACHINES

 

19.

ONLINE MONITORING OF RLY TRACK HEALTH

 

20.

EXPERIENCE OVER THE PLANNING, DESIGN & EXECUTION

 

21.

IMPROVING OUTPUT THROUGH TAMPING & TTR

 

22.

STEEL SHEET PILE AS A PROTECTIVE WALL IN URBAN

 

23.

APPLYING EN STANDARDS TO THE DESIGN