IPWE Event Details ( held on 22 & 23 February 2019, Secunderabad )
SN Topic of Paper            Name & Designation of Author
FROM
TO

Session I (Click to view Presentations)


(11:00 to 13:30 Hrs)- Challenges in introducing Speeds of 160 kmph for passenger trains and 100 kmph for high axle load freight trains on IR.

Papers selected for Presentation & Printing
1.1 Challenges in introducing speed of 160 kmph for passenger trains and 100 kmph for high axle freight on IR Sunil Kumar Gupta
Sr. DEN(CO)/AGC/NCR
Sujeet Kumar
ADEN/2/MTJ/AGC/NCR
11:00 11:15
1.2 DYNAMIC TRACK STABILISER – AN INDESPENSIBLE MAINTENANCE MACHINE FOR HIGH SPEED ROUTES Anil Choudhary, Sr.Prof. IRICEN,Pune. 11:16 11:31
1.3 FATIGUE CRITERION BASED STRESS ANALYSIS FOR RAIL, A MUST FOR HIGH-SPEED AND HEAVY FREIGHT TRAFFIC S.Gopalakrishnan Ex. Director, IRICEN & Retd. AM(W)/RB. M. S. Ekbote Retd.AM/CE/RB R.K.Shekhawat, Sr.Prof. IRICEN 11:32 11:47
1.4 Study on use of 60 kg 90 UTS Rail for 25T Axle Load Veer Narayan, IRSE, Charalambos Zois, Vice President, Systra International Track Expert, Systra 11:48 12:03
1.5 SELECTION OF RAIL UNDER MIXED TRAFFIC REGIME ON IR – PASSENGER OPERATIONS AT 160 KMPH ALONG WITH 25T FREIGHT OPERATION Nilmani, Executive Director/Track-I/RDSO
Ajay Kumar, Director/Track -II/RDSO
12:04 12:19
1.6 Design and Development of New Track Components including Wider & Heavier PSC Sleeper and Fastening System suitable for Semi-high speed and heavy Axle Load

Sandeep Sharma,Executive Director/Track-II/RDSO, 2.Pranav Kumar,Director/Track-IV/RDSO,

3.Rituraj, Jt. Director/P&C/RDSO, 4.S K Awasthi, Dy. Director/CS/RDSO

12:20 12:35
1.7 CHALLENGES FOR HIGHER SPEED ON INDIAN RAILWAYS
FOLLOW THE SOLVED EXAMPLE
J.S. MUNDREY, President- Rail Consult India (Formerly Adviser Civil Engineering, RB) 12:36 12:51
1.8 Challenges in introducing Speeds of 160 kmph for passenger trains and 100 kmph for high axle load freight trains on IR. S K Srivatava, ED(Mobility) CE/RB, Niranjan Kumar, SSE(Mobility)/RB 12:52 13:07
1.9 Replacement of Over Riding Switches by Thick Web Switches (TWS) on Golden Quadrilateral Route of Kazipet-Balharshah Section-A Field experience Akshay Kumar Jha, CTE/SCRly, D.S.Rama Rao, Sr.DEN/North/ Secunderabad, P.Devender SSE/PWay/ SW/Secunderabad 13:08 13:23
Session 2 (Click to view Presentations)  
(14:30 to 16:30 Hrs)- Innovation and Technologies for Fast Paced Construction.
   
Papers selected for Presentation & Printing    
2.1 Case Study on Project Planning for Fast PacedConstruction of Tori-Shivpurnew BG rail line Sitesh Kumar Singh, CE/Con/ SE/ECR Lakhan Lal Meena, Dy.CE/ Construction, ECR 14:30 14:48
2.2 Slipform construction for Major Bridges with tall piers in Madar-Iqbalgarh section of WDFC M.S.Hashmi
GGM/ROB/WC-I
14:49 15:09
2.3 Fast Track Modular Construction of Pier Caps at Yamuna and Hindon Rivers Hari Mohan Gupta CGM/Noida/DFCCIL Praveen Kumar GGM/P/WC/DFCCIL 15:10 15:29
2.4 Construction of Single Barrel Limited Height Subway by “Box Pulling Technique“under the traffic block .
Ved Parkash Dudeja,
Chief Engineer/Construction
Northern Railway
15:30 15:49
2.5 Innovative Approaches/Methods adopted in Fast Pace Construction of RUBs to achieve huge target of elimination of UMLCs on S.C. Railway B.Ashok,CBE/SCR, J.Sadharma Dev Royal, DyCE/Br.lines/SCR 15:50 16:08
2.6 CONSTRUCTION OF 16 UNITS PREFABRICATED RESIDENTIAL QUARTERS JAKHAPURA,KHURDA DIVISION,EAST COAST RAILWAY S.Maileri, Sr.DEN/Khurda Rd/ ECR 16:09 16:25

DAY-2   23-02-2019

Paper Presentation on 23.Feb.2019
SN Topic of Paper Name & Designation of Author
FROM
TO
Session 3 (Click to view Presentations) 

(9:30 to 11:15 Hrs) – Miscellaneous

Papers selected for Presentation & Printing    
3.1 IT enablement of Engg Dept. On IR-Status & Roadmap Ahead B.P Awasthi, ED/TKP 9:30 9:44
3.2 Equivalent Track Twist due to Breakage of Primary Suspension Spring of ICF Bogie S. K. Agarwal, PCE/CR
Sharad Kumar Agarwal, Prof. IRICEN
Pavan B. Shejol*, Tushar N. Bade*, Ganesh S. Tate* and Omkar B. Motegaonkar* (* Final year students from M.E.S. College of Engineering, Pune)
9:45 10:00
3.3 Graphical Solutions for complex layouts for Introducing Higher Speeds on existing system. Shri A K Jain/CRS/Central Circle/Mumbai
Swapnil Chaurasia/ADEN BINA, WCR
10:01 10:14
3.4 Improving Safety at Non-Interlocked Level Crossing Gates -Smart Real Time Gate Position And Auto Private Number System. S. Varun Babu DEN/East/ Vijayawada , Akshay Kumar Jha CTE/SCRly, N.Satish Kumar ADEN/Bridge/North/ Vijayawada Division 10:15 10:30
3.5 FORMATION TREATMENT BY MOORUM BLANKETTING BETWEEN GIDDALUR- YADAVALLI STATIONS, NALLAPADU-NADYAL SECTION, GUNTUR DIVISION OF SOUTH CENTRAL RAILWAY T.ANIL KUMARSr.DEN/Central/ Secunderabad Division
S.C.Railway
10:31 10:44
3.6 A STUDY ON PERFORMANCE OF IN-SITU RECONDITIONING OF CMS CROSSINGS UNDER TRIAL BY TRANSLAMATIC ROBOTIC WELDING TECHNIQUE. K. SRINIVAS, ADEN/East/ Secunderabad 10:45 11:00
3.7 CONSTRUCTION OF RAFT FOUNDATIONS: THE CASE STUDIES OF RAFT FOUNDATIONS OF BRIDGE NO. 43 AND 44 (CHENAB BRIDGE) AT BAKKAL, USBRL PROJECT Praveen Kumar, IRSE, XEN/Const/Planning-I, NR 11:01 11:10
Session 4 (Click to view Presentations) 

(11:30 to 13:15 Hrs) – Trades

   
4.1 M/s Plasser India Pvt Ltd./Faridabad   11:30* 11:40*
4.2 M/s The India Thermit Corporation Kanpur   11:41* 11:50*
4.3 Steel Authority of India   11:51* 12:00*
4.4 M/s Patil Rail Infrastructure Pvt. Ltd.   12:01* 12:12*
4.5 M/s HARSCO TRACK MACHINES AND SERVICES PVT LTD   12:13* 12:20*
4.6 M/s VOESTALPINE VAE VKN INDIA PVT LTD   12:21* 12:31*
4.7 Development of High Strength Rail Steel Using Head Hardening Technology – Capability and Capacity in Jindal Steel & Power Limited, Raigarh, CG Mr Ashwani Kumar – VP, Product Application Group, Jindal Steel & Power Limited. 12:32* 12:42*
4.8 Amberg IMS for track maintenance Amberg Technologies Switzerland Sandeep Joshi & Mr. Stephen Graph. AMBERG: Phooltas Transrail Limited 12:43* 12:53*
4.9 Few More presentations to be added   12:54* 13:10*
NOTE: * Time Slots are Tentative
Session 5 (Click to view Presentations) 

(14:00 to 16:00 Hrs)

 
Papers selected for Presentation & Printing
5.1 ASSESSMENT OF VEHICLE DYNAMICS AND IT’S IMPACT OVER TRACK DEGRADATION Nitish Kumar Ranjan
Dy.Chief Vigilance Officer (Engg)/SWR/ Hubali.
14:00 14:22
5.2 Provision of Thick Web Switches for Increasing Speed on Turnouts to 50 Kmph – A Case Study for Gooty (GY) – Renigunta (RU) Section of
South Central Railway.
Akshay Kumar Jha,CTE/SCR A.Balaji Rao,DyCE/Tr.-I/SCR, Jayaprakash Reddy,DEN/Central/Guntakal/SCR 14:23 14:46
5.3 Provision of Steel based self supporting roofing system for scrap pre-conditioning bay in Rail Wheel Factory, Yelahanka, Bengaluru. S.Prabhu, IRSE
CE(Gl)/SWR/Hubballi,
14:47 15:10
5.4 Cross-Over Correction with the Use of Rail Tensor and Special Type Rollers D.S. Rama Rao Sr.DEN/North/ SC division , Akshay Kumar Jha CTE/SCRly V. Bhanu Prakash SSE/PWay/ PDPL/SC division 15:11 15:34
5.5 Rails for Speeds of 160 kmph for passenger trains and 100 kmph for high axle load freight trains on IR – Modifications required for IRS Rail Specifications C. Ramamurthy, Retr.XEN/SER
Track Design Engineer, SMEC International Pty. Ltd.
Consultant, Bangladesh Railway Projects
Founder Member, IPWE (I) India
15:35 13:55