Session-1

OPTIMIZING AND IMPROVING OUTPUT OF TRACK MACHINES DURING TRAFFIC BLOCKS

 

1.1

A PRECIOUS COMMODITY DESERVES HIGH-LEVEL TEC

 

1.2

OPTIMIZATION OF NTC AND ASSOCIATED TRACK MAC

 

1.3

INCREASING THE PRODUCTIVITY OF TRACK MACHINE

 

1.4

DESIGN MODE TAMPING OF TRACK USING TRIMBLE

 

1.5

EFFECT OF USING LONGER MEASURING CHORD IN

 

1.6

INNOVATION IN BCM MACHINE TO OPTIMISE AND

 

1.7

PROPER METHOD OF CORRECTING LARGE ALIGNMENT

   

Session-2

ACCELERATED CONSTRUCTION OF DOUBLING PROJECTS

 

2.1

A PRECIOUS COMMODITY DESERVES HIGH-LEVEL TEC

 

2.2

OPTIMIZATION OF NTC AND ASSOCIATED TRACK MAC

 

2.3

INCREASING THE PRODUCTIVITY OF TRACK MACHINE

 

2.4

DESIGN MODE TAMPING OF TRACK USING TRIMBL

 

2.5

EFFECT OF USING LONGER MEASURING CHORD IN

 

2.6

INNOVATION IN BCM MACHINE TO OPTIMISE AND

 

2.7

PROPER METHOD OF CORRECTING LARGE ALIGNMENT

   

Session-3

ACCELERATED CONSTRUCTION OF DOUBLING PROJECTS

 

3.1

IMPORTANCE OF BRIDGE DRAWINGS IN SPEEDY EXECUTION OF DOUBLING PROJE

 

3.2

PRE-ENGINEERED OR PRE-FABRICATED BUILDING, THE TIME-SAVING NOUVEAU

 

3.3

INNOVATIVE WAYS FOR TRACK WORKS IN YARDS

 

3.4

FASTER CONSTRUCTION METHODS IN LAUNCHING OF OPEN WEB GIRDERS O

 

3.5

SUGGESTED MEASURES FOR ACCELERATED CONSTRUCTION OF DOUBLING PR

 

3.6

NEW MECHANIZED CONSTRUCTION TECHNIQUES FOR FAST PACED CONSTRUCTION

 

3.7

ACCELERATED CONSTRUCTION OF DOUBLING PROJECTS

   

Session-4

MISCELLANEOUS

 

4.1

WHY IR NEED HIGH STRENGTH RAILS

 

4.2

INDEPENDENT PROJECT MANAGEMENT AUDIT

 

4.3

ANALYSIS OF PERFORMANCE OF IMPROVED SEJ (T-6902) IN THE FIELD

 

4.4

CONSTRUCTION OF HYBRID PILE FOUNDATIONS A CASE STUDY OF HYBRID PILE FOUNDATION P3 OF BRIDGE NO

 

4.5

DETERMINISTIC APPROACH TO ASSESS THE TRACK MODULUS IN SHAKE DOWNSTATE OF TRACK BALLAST

 

4.6

IMPROVING QUALITY OF AT WELDING

 

4.7

INTERNATIONAL PRACTICES IN SUSTAINABLE TRANSPORT INFRASTRUCTURE DEVELOPMENT

 

4.8

VARIOUS METHODS OF RAIL FLASH BUTT WELDING ON IR AND THEIR MERITS & DEMERITS FOR CAPACITY ENHAN

 

4.9

RAILWAY INFRASTRUCTURE INVESTMENT PLAN

   

Session-5

PRESENTATIONS BY TRADE &INDUSTRY

 

5.1

ADVANTAGES OF TENSILE FABRIC STRUCTURES IN ACCELERATING THE DOUBLING PROJECTS

 

5.2

STABILIZATION OF RAILWAY TRACK USING OF GEOGRID AND GEOTEXTILE

 

5.3

ENVIRONMENT-FRIENDLY CONSTRUCTION AND WASTE MANAGEMENT IN KHURJA – DADRI SECTION

 

5.4

HEXAGON RAILWAY SOLUTIONS

 

5.5

FEM ANALYSIS OF RAILWAY EMBANKMENT WITH ENHANCED LOAD CAPACITY ON POOR SUBGRADES

 

5.6

INTERNET OF THINGS

 

5.7

ONLINE MONITORING OF RAILWAY TRACK HEALTH

   

--

ONLY PAPERS PUBLISHED

     
 

1.

OPTIMIZING AND IMPROVING OUTPUT OF BCM

 

2.

FAST PACE DEEP SCREENING OF TURNOUTS BY BCM AFTER SLEWING THE ADJACENT MAINLINE AND EXTENSIVE USE OF JCB FOR REMOVING OBSTR

 

3.

A STEP TOWARDS IMPROVING BCM OPERATION EFFICIENCY AND THE TRACK MAINTENANCE SYSTEM

 

4.

GEOCELL AN EMERGING TECHNIQUE OF SOIL REINFORCEMENT IN CIVIL ENGINEERING FIELD

 

5.

A CASE STUDY “BALANCE DOUBLING BETWEEN LUCKNOW- SULTANPUR-VARANASI (148KM DOUBLING WORK)” AND CRITICAL ISSUES OBSERVED

 

6.

नई रेलवे लाइन एवं दोहरीकरण निर्माण परियोजनाओ को गति प्रदान करना

 

7.

ACCELERATED CONSTRUCTION OF DOUBLING PROJECT

 

8.

PROPOSAL FOR STANDARDIZATION OF TUNNEL CROSS-SECTION, DESIGN AND DRAWINGS IN IR

 

9.

ACCELERATED CONSTRUCTION OF DOUBLINGMULTIPLE LINE PROJECTS

 

10.

INFLUENCE OF NON-LINEAR BEHAVIOR OF TRACK FASTENING SYSTEM ON TRACK MODULUS

 

11.

CONVERGENCE OF MGNREGS WITH RAILWAYS AND THEREBY UTILIZING FOR PERMANENT WAY ACTIVITIES

 

12.

SLOPE EROSION CONTROL AND PROTECTION SYSTEM ADOPTED IN EASTERN DFCCIL PROJECT FOR RAILWAY FORMATION FOR SPEEDY CONSTRUCTION

 

13.

OPTIMISING USE OF TRAFFIC BLOCKS WITH INTEGRATED APPROACH AND BLOCK MANAGEMENT SYSTEM

 

14.

PLANNING OF DOUBLING PROJECT FOR ACCELERATED CONS

 

15.

USE OF TAMPING SIMULATOR FOR OPTIMIZING TRACK

 

16.

CORRELATION BETW TRC RECORDING & FIELD MEASUREMENTS

 

17.

EXCEL PROGRAM FOR ANALYSIS OF FIXED ARCHES

 

18.

OPTIMIZING & IMPROVING OUTPUT OF TRACK MACHINES

 

19.

ONLINE MONITORING OF RLY TRACK HEALTH

 

20.

EXPERIENCE OVER THE PLANNING, DESIGN & EXECUTION

 

21.

IMPROVING OUTPUT THROUGH TAMPING & TTR

 

22.

STEEL SHEET PILE AS A PROTECTIVE WALL IN URBAN

 

23.

APPLYING EN STANDARDS TO THE DESIGN

 

IPWE Event Details ( held on 22 & 23 February 2019, Secunderabad )
SN Topic of Paper            Name & Designation of Author
FROM
TO

Session I (Click to view Presentations)


(11:00 to 13:30 Hrs)- Challenges in introducing Speeds of 160 kmph for passenger trains and 100 kmph for high axle load freight trains on IR.

Papers selected for Presentation & Printing
1.1 Challenges in introducing speed of 160 kmph for passenger trains and 100 kmph for high axle freight on IR Sunil Kumar Gupta
Sr. DEN(CO)/AGC/NCR
Sujeet Kumar
ADEN/2/MTJ/AGC/NCR
11:00 11:15
1.2 DYNAMIC TRACK STABILISER – AN INDESPENSIBLE MAINTENANCE MACHINE FOR HIGH SPEED ROUTES Anil Choudhary, Sr.Prof. IRICEN,Pune. 11:16 11:31
1.3 FATIGUE CRITERION BASED STRESS ANALYSIS FOR RAIL, A MUST FOR HIGH-SPEED AND HEAVY FREIGHT TRAFFIC S.Gopalakrishnan Ex. Director, IRICEN & Retd. AM(W)/RB. M. S. Ekbote Retd.AM/CE/RB R.K.Shekhawat, Sr.Prof. IRICEN 11:32 11:47
1.4 Study on use of 60 kg 90 UTS Rail for 25T Axle Load Veer Narayan, IRSE, Charalambos Zois, Vice President, Systra International Track Expert, Systra 11:48 12:03
1.5 SELECTION OF RAIL UNDER MIXED TRAFFIC REGIME ON IR – PASSENGER OPERATIONS AT 160 KMPH ALONG WITH 25T FREIGHT OPERATION Nilmani, Executive Director/Track-I/RDSO
Ajay Kumar, Director/Track -II/RDSO
12:04 12:19
1.6 Design and Development of New Track Components including Wider & Heavier PSC Sleeper and Fastening System suitable for Semi-high speed and heavy Axle Load

Sandeep Sharma,Executive Director/Track-II/RDSO, 2.Pranav Kumar,Director/Track-IV/RDSO,

3.Rituraj, Jt. Director/P&C/RDSO, 4.S K Awasthi, Dy. Director/CS/RDSO

12:20 12:35
1.7 CHALLENGES FOR HIGHER SPEED ON INDIAN RAILWAYS
FOLLOW THE SOLVED EXAMPLE
J.S. MUNDREY, President- Rail Consult India (Formerly Adviser Civil Engineering, RB) 12:36 12:51
1.8 Challenges in introducing Speeds of 160 kmph for passenger trains and 100 kmph for high axle load freight trains on IR. S K Srivatava, ED(Mobility) CE/RB, Niranjan Kumar, SSE(Mobility)/RB 12:52 13:07
1.9 Replacement of Over Riding Switches by Thick Web Switches (TWS) on Golden Quadrilateral Route of Kazipet-Balharshah Section-A Field experience Akshay Kumar Jha, CTE/SCRly, D.S.Rama Rao, Sr.DEN/North/ Secunderabad, P.Devender SSE/PWay/ SW/Secunderabad 13:08 13:23
Session 2 (Click to view Presentations)  
(14:30 to 16:30 Hrs)- Innovation and Technologies for Fast Paced Construction.
   
Papers selected for Presentation & Printing    
2.1 Case Study on Project Planning for Fast PacedConstruction of Tori-Shivpurnew BG rail line Sitesh Kumar Singh, CE/Con/ SE/ECR Lakhan Lal Meena, Dy.CE/ Construction, ECR 14:30 14:48
2.2 Slipform construction for Major Bridges with tall piers in Madar-Iqbalgarh section of WDFC M.S.Hashmi
GGM/ROB/WC-I
14:49 15:09
2.3 Fast Track Modular Construction of Pier Caps at Yamuna and Hindon Rivers Hari Mohan Gupta CGM/Noida/DFCCIL Praveen Kumar GGM/P/WC/DFCCIL 15:10 15:29
2.4 Construction of Single Barrel Limited Height Subway by “Box Pulling Technique“under the traffic block .
Ved Parkash Dudeja,
Chief Engineer/Construction
Northern Railway
15:30 15:49
2.5 Innovative Approaches/Methods adopted in Fast Pace Construction of RUBs to achieve huge target of elimination of UMLCs on S.C. Railway B.Ashok,CBE/SCR, J.Sadharma Dev Royal, DyCE/Br.lines/SCR 15:50 16:08
2.6 CONSTRUCTION OF 16 UNITS PREFABRICATED RESIDENTIAL QUARTERS JAKHAPURA,KHURDA DIVISION,EAST COAST RAILWAY S.Maileri, Sr.DEN/Khurda Rd/ ECR 16:09 16:25

DAY-2   23-02-2019

Paper Presentation on 23.Feb.2019
SN Topic of Paper Name & Designation of Author
FROM
TO
Session 3 (Click to view Presentations) 

(9:30 to 11:15 Hrs) – Miscellaneous

Papers selected for Presentation & Printing    
3.1 IT enablement of Engg Dept. On IR-Status & Roadmap Ahead B.P Awasthi, ED/TKP 9:30 9:44
3.2 Equivalent Track Twist due to Breakage of Primary Suspension Spring of ICF Bogie S. K. Agarwal, PCE/CR
Sharad Kumar Agarwal, Prof. IRICEN
Pavan B. Shejol*, Tushar N. Bade*, Ganesh S. Tate* and Omkar B. Motegaonkar* (* Final year students from M.E.S. College of Engineering, Pune)
9:45 10:00
3.3 Graphical Solutions for complex layouts for Introducing Higher Speeds on existing system. Shri A K Jain/CRS/Central Circle/Mumbai
Swapnil Chaurasia/ADEN BINA, WCR
10:01 10:14
3.4 Improving Safety at Non-Interlocked Level Crossing Gates -Smart Real Time Gate Position And Auto Private Number System. S. Varun Babu DEN/East/ Vijayawada , Akshay Kumar Jha CTE/SCRly, N.Satish Kumar ADEN/Bridge/North/ Vijayawada Division 10:15 10:30
3.5 FORMATION TREATMENT BY MOORUM BLANKETTING BETWEEN GIDDALUR- YADAVALLI STATIONS, NALLAPADU-NADYAL SECTION, GUNTUR DIVISION OF SOUTH CENTRAL RAILWAY T.ANIL KUMARSr.DEN/Central/ Secunderabad Division
S.C.Railway
10:31 10:44
3.6 A STUDY ON PERFORMANCE OF IN-SITU RECONDITIONING OF CMS CROSSINGS UNDER TRIAL BY TRANSLAMATIC ROBOTIC WELDING TECHNIQUE. K. SRINIVAS, ADEN/East/ Secunderabad 10:45 11:00
3.7 CONSTRUCTION OF RAFT FOUNDATIONS: THE CASE STUDIES OF RAFT FOUNDATIONS OF BRIDGE NO. 43 AND 44 (CHENAB BRIDGE) AT BAKKAL, USBRL PROJECT Praveen Kumar, IRSE, XEN/Const/Planning-I, NR 11:01 11:10
Session 4 (Click to view Presentations) 

(11:30 to 13:15 Hrs) – Trades

   
4.1 M/s Plasser India Pvt Ltd./Faridabad   11:30* 11:40*
4.2 M/s The India Thermit Corporation Kanpur   11:41* 11:50*
4.3 Steel Authority of India   11:51* 12:00*
4.4 M/s Patil Rail Infrastructure Pvt. Ltd.   12:01* 12:12*
4.5 M/s HARSCO TRACK MACHINES AND SERVICES PVT LTD   12:13* 12:20*
4.6 M/s VOESTALPINE VAE VKN INDIA PVT LTD   12:21* 12:31*
4.7 Development of High Strength Rail Steel Using Head Hardening Technology – Capability and Capacity in Jindal Steel & Power Limited, Raigarh, CG Mr Ashwani Kumar – VP, Product Application Group, Jindal Steel & Power Limited. 12:32* 12:42*
4.8 Amberg IMS for track maintenance Amberg Technologies Switzerland Sandeep Joshi & Mr. Stephen Graph. AMBERG: Phooltas Transrail Limited 12:43* 12:53*
4.9 Few More presentations to be added   12:54* 13:10*
NOTE: * Time Slots are Tentative
Session 5 (Click to view Presentations) 

(14:00 to 16:00 Hrs)

 
Papers selected for Presentation & Printing
5.1 ASSESSMENT OF VEHICLE DYNAMICS AND IT’S IMPACT OVER TRACK DEGRADATION Nitish Kumar Ranjan
Dy.Chief Vigilance Officer (Engg)/SWR/ Hubali.
14:00 14:22
5.2 Provision of Thick Web Switches for Increasing Speed on Turnouts to 50 Kmph – A Case Study for Gooty (GY) – Renigunta (RU) Section of
South Central Railway.
Akshay Kumar Jha,CTE/SCR A.Balaji Rao,DyCE/Tr.-I/SCR, Jayaprakash Reddy,DEN/Central/Guntakal/SCR 14:23 14:46
5.3 Provision of Steel based self supporting roofing system for scrap pre-conditioning bay in Rail Wheel Factory, Yelahanka, Bengaluru. S.Prabhu, IRSE
CE(Gl)/SWR/Hubballi,
14:47 15:10
5.4 Cross-Over Correction with the Use of Rail Tensor and Special Type Rollers D.S. Rama Rao Sr.DEN/North/ SC division , Akshay Kumar Jha CTE/SCRly V. Bhanu Prakash SSE/PWay/ PDPL/SC division 15:11 15:34
5.5 Rails for Speeds of 160 kmph for passenger trains and 100 kmph for high axle load freight trains on IR – Modifications required for IRS Rail Specifications C. Ramamurthy, Retr.XEN/SER
Track Design Engineer, SMEC International Pty. Ltd.
Consultant, Bangladesh Railway Projects
Founder Member, IPWE (I) India
15:35 13:55

 

IPWE Seminar GOA - Feb 2020
 
IPWE Seminar GOA - Feb 2020
 
IPWE Seminar GOA - Feb 2020
 
IPWE Seminar GOA - Feb 2020
 
 
IPWE Seminar 2016 - Video Gallery 

  

 
 
Northern Railway Civil Engineering Department Presents
IPWE Seminar 2016 - Photo Gallery - Ist Day
 
 IPWE Seminar 2016 - Photo Gallery - Seminar
 
 IPWE Seminar 2016 - Photo Gallery - Exhibition
 
 IPWE Seminar 2016 - Photo Gallery - Saanskritik Sandhya
 
 IPWE Seminar 2016 - Photo Gallery - Last Day
 
 IPWE Seminar 2016 - Photo Gallery - Women's Participation