Session-1
|
OPTIMIZING AND IMPROVING OUTPUT OF TRACK MACHINES DURING TRAFFIC BLOCKS
|
|
1.1
|
A PRECIOUS COMMODITY DESERVES HIGH-LEVEL TEC
|
|
1.2
|
OPTIMIZATION OF NTC AND ASSOCIATED TRACK MAC
|
|
1.3
|
INCREASING THE PRODUCTIVITY OF TRACK MACHINE
|
|
1.4
|
DESIGN MODE TAMPING OF TRACK USING TRIMBLE
|
|
1.5
|
EFFECT OF USING LONGER MEASURING CHORD IN
|
|
1.6
|
INNOVATION IN BCM MACHINE TO OPTIMISE AND
|
|
1.7
|
PROPER METHOD OF CORRECTING LARGE ALIGNMENT
|
|
|
Session-2
|
ACCELERATED CONSTRUCTION OF DOUBLING PROJECTS
|
|
2.1
|
A PRECIOUS COMMODITY DESERVES HIGH-LEVEL TEC
|
|
2.2
|
OPTIMIZATION OF NTC AND ASSOCIATED TRACK MAC
|
|
2.3
|
INCREASING THE PRODUCTIVITY OF TRACK MACHINE
|
|
2.4
|
DESIGN MODE TAMPING OF TRACK USING TRIMBL
|
|
2.5
|
EFFECT OF USING LONGER MEASURING CHORD IN
|
|
2.6
|
INNOVATION IN BCM MACHINE TO OPTIMISE AND
|
|
2.7
|
PROPER METHOD OF CORRECTING LARGE ALIGNMENT
|
|
|
Session-3
|
ACCELERATED CONSTRUCTION OF DOUBLING PROJECTS
|
|
3.1
|
IMPORTANCE OF BRIDGE DRAWINGS IN SPEEDY EXECUTION OF DOUBLING PROJE
|
|
3.2
|
PRE-ENGINEERED OR PRE-FABRICATED BUILDING, THE TIME-SAVING NOUVEAU
|
|
3.3
|
INNOVATIVE WAYS FOR TRACK WORKS IN YARDS
|
|
3.4
|
FASTER CONSTRUCTION METHODS IN LAUNCHING OF OPEN WEB GIRDERS O
|
|
3.5
|
SUGGESTED MEASURES FOR ACCELERATED CONSTRUCTION OF DOUBLING PR
|
|
3.6
|
NEW MECHANIZED CONSTRUCTION TECHNIQUES FOR FAST PACED CONSTRUCTION
|
|
3.7
|
ACCELERATED CONSTRUCTION OF DOUBLING PROJECTS
|
|
|
Session-4
|
MISCELLANEOUS
|
|
4.1
|
WHY IR NEED HIGH STRENGTH RAILS
|
|
4.2
|
INDEPENDENT PROJECT MANAGEMENT AUDIT
|
|
4.3
|
ANALYSIS OF PERFORMANCE OF IMPROVED SEJ (T-6902) IN THE FIELD
|
|
4.4
|
CONSTRUCTION OF HYBRID PILE FOUNDATIONS A CASE STUDY OF HYBRID PILE FOUNDATION P3 OF BRIDGE NO
|
|
4.5
|
DETERMINISTIC APPROACH TO ASSESS THE TRACK MODULUS IN SHAKE DOWNSTATE OF TRACK BALLAST
|
|
4.6
|
IMPROVING QUALITY OF AT WELDING
|
|
4.7
|
INTERNATIONAL PRACTICES IN SUSTAINABLE TRANSPORT INFRASTRUCTURE DEVELOPMENT
|
|
4.8
|
VARIOUS METHODS OF RAIL FLASH BUTT WELDING ON IR AND THEIR MERITS & DEMERITS FOR CAPACITY ENHAN
|
|
4.9
|
RAILWAY INFRASTRUCTURE INVESTMENT PLAN
|
|
|
Session-5
|
PRESENTATIONS BY TRADE &INDUSTRY
|
|
5.1
|
ADVANTAGES OF TENSILE FABRIC STRUCTURES IN ACCELERATING THE DOUBLING PROJECTS
|
|
5.2
|
STABILIZATION OF RAILWAY TRACK USING OF GEOGRID AND GEOTEXTILE
|
|
5.3
|
ENVIRONMENT-FRIENDLY CONSTRUCTION AND WASTE MANAGEMENT IN KHURJA – DADRI SECTION
|
|
5.4
|
HEXAGON RAILWAY SOLUTIONS
|
|
5.5
|
FEM ANALYSIS OF RAILWAY EMBANKMENT WITH ENHANCED LOAD CAPACITY ON POOR SUBGRADES
|
|
5.6
|
INTERNET OF THINGS
|
|
5.7
|
ONLINE MONITORING OF RAILWAY TRACK HEALTH
|
|
|
--
|
ONLY PAPERS PUBLISHED
|
|
|
|
|
1.
|
OPTIMIZING AND IMPROVING OUTPUT OF BCM
|
|
2.
|
FAST PACE DEEP SCREENING OF TURNOUTS BY BCM AFTER SLEWING THE ADJACENT MAINLINE AND EXTENSIVE USE OF JCB FOR REMOVING OBSTR
|
|
3.
|
A STEP TOWARDS IMPROVING BCM OPERATION EFFICIENCY AND THE TRACK MAINTENANCE SYSTEM
|
|
4.
|
GEOCELL AN EMERGING TECHNIQUE OF SOIL REINFORCEMENT IN CIVIL ENGINEERING FIELD
|
|
5.
|
A CASE STUDY “BALANCE DOUBLING BETWEEN LUCKNOW- SULTANPUR-VARANASI (148KM DOUBLING WORK)” AND CRITICAL ISSUES OBSERVED
|
|
6.
|
नई रेलवे लाइन एवं दोहरीकरण निर्माण परियोजनाओ को गति प्रदान करना
|
|
7.
|
ACCELERATED CONSTRUCTION OF DOUBLING PROJECT
|
|
8.
|
PROPOSAL FOR STANDARDIZATION OF TUNNEL CROSS-SECTION, DESIGN AND DRAWINGS IN IR
|
|
9.
|
ACCELERATED CONSTRUCTION OF DOUBLINGMULTIPLE LINE PROJECTS
|
|
10.
|
INFLUENCE OF NON-LINEAR BEHAVIOR OF TRACK FASTENING SYSTEM ON TRACK MODULUS
|
|
11.
|
CONVERGENCE OF MGNREGS WITH RAILWAYS AND THEREBY UTILIZING FOR PERMANENT WAY ACTIVITIES
|
|
12.
|
SLOPE EROSION CONTROL AND PROTECTION SYSTEM ADOPTED IN EASTERN DFCCIL PROJECT FOR RAILWAY FORMATION FOR SPEEDY CONSTRUCTION
|
|
13.
|
OPTIMISING USE OF TRAFFIC BLOCKS WITH INTEGRATED APPROACH AND BLOCK MANAGEMENT SYSTEM
|
|
14.
|
PLANNING OF DOUBLING PROJECT FOR ACCELERATED CONS
|
|
15.
|
USE OF TAMPING SIMULATOR FOR OPTIMIZING TRACK
|
|
16.
|
CORRELATION BETW TRC RECORDING & FIELD MEASUREMENTS
|
|
17.
|
EXCEL PROGRAM FOR ANALYSIS OF FIXED ARCHES
|
|
18.
|
OPTIMIZING & IMPROVING OUTPUT OF TRACK MACHINES
|
|
19.
|
ONLINE MONITORING OF RLY TRACK HEALTH
|
|
20.
|
EXPERIENCE OVER THE PLANNING, DESIGN & EXECUTION
|
|
21.
|
IMPROVING OUTPUT THROUGH TAMPING & TTR
|
|
22.
|
STEEL SHEET PILE AS A PROTECTIVE WALL IN URBAN
|
|
23.
|
APPLYING EN STANDARDS TO THE DESIGN
|